Outline
<Project summary>
Name of building Minatomirai Center Building
Address 6-3, 6-4, 6-5, 6-6 Minatomirai 3-chome, Nishi-ku, Yokohama City, Kanagawa Prefecture
Access Direct access to Minatomirai Station on the Minatomirai Line (Yokohama High-Speed Railways)
Architects and managers TAISEI Corporation. (First Class Architects, Office)
Builders TAISEI Corporation. Yokohama Office
Supervisors Nihon Sekkei, Inc.
Completion date May 2010
<Building summary>
Use Offices, shops, car park
Structure Reinforced concrete, steel frame, steel frame reinforced concrete structure
Size 21 story with 2 basement
Site area 10,131.57m2(03,064.79 tsubo)
Building area 5,197.87m2(1,572.35 tsubo)
Total floor area 95,220.30m2(28,804.14 tsubo)
Total exclusive area 63,918.59m2(19,335.37 tsubo)
Offices 60,395.88m2(18,269.75 tsubo)
Shops 3,522.71m2(1,065.61 tsubo)
<Office floor summary>
Standard floor rental area 3,348.82m2(1,013.01 tsubo)
Partitioning Can be divided into 8 sections
Ceiling height 2,950mm
Floor load 500kg/m2(Heavy-duty zone 800kg/m2
Ceiling Grid ceiling
OA floor H=100mm
Electrical capacity Power outlet capacity 70VA/m2
Lighting Grid lighting system, average tabletop illuminance 700lx
Communications Optical fiber cable already provided to building
Air conditioning Central method employing local heating and cooling system
VAV (variable airflow devices) 64 units on each floor, approx. every 60m2
<Description of facilities>
Car park Total of 352 vehicles
Elevator for office 16 elevators with capacity of 20 passengers
Project manager

オリックス不動産株式会社

Daiwa House

Ken Corporation

Property management R.A Asset Management
※ The perspectives, drawings, etc. are only images and may be different from actual conditions upon completion.
  The details may be subject to change.